Materials Handling Engineer - PT YTL Jawa Timur Paiton II Power Station

PT YTL Jawa Timur - YTLPI has a 35% stake in PT Jawa Power which owns a 1,220MW coal-fired power plant located at the Paiton Power Generation Complex in East Java, Indonesia. Jawa Power is the second largest IPP in Indonesia and has a 30-year PPA with PT PLN (Persero), the state-owned electric utility company. PT YTL Jawa Timur Paiton II Power Station - Under Indonesia’s private power programme, PT. YTL Jawa Timur operates and maintains this 2 x 610 MW Coal-fired Power Station. The station is located at Paiton, Probolinggo District of East Java, 141 km Southeast of Surabaya. We are currently have vacancy for
MATERIALS HANDLING ENGINEER
Responsibilities of the Engineer include the long term integrity and short term maintenance activities associated with the Material Handling Plant including Coal & Ash Handling, Air Heater, Fans, FGD and its associated equipments.
Candidates for this position should possess minimum qualifications and competencies as follows:
- S-1 degree in Mechanical Engineering from a reputable University.
- Possessing 4 years experience as a maintenance Engineer on Coal & Ash Handling , Air Heater, Fans, FGD , Rotating equipments and Steam Power Plant associated equipments.
- Having knowledge of materials, welding, NDT, alignment, rigging, and Failure Root analysis.
- A sound understanding of preventive and predictive maintenance.
- Self starter and having strong motivation.
- Excellent English both spoken and written.
- Maximum 35 years old.
Remuneration and benefits will be comparable with the best in this industrial sector. Please send a fully detailed CV in English, latest on Friday, 12 June 2009 to:
PT. YTL JAWA TIMUR
Tromol Pos No 36
Paiton - Probolinggo, Jawa Timur 67291
Or recruitment@ytljt.com
Your CV will be kept in strict confidence
Please include a contact telephone number and recent photograph.
Tags: Jawa Timur, paiton








